Skip to content
Adcom Kitchen & Flooring
Partly installed light vinyl plank floor in an empty Los Angeles living room with tools set aside

Flooring

Flooring Installation in Los Angeles, CA

Flooring installation in Los Angeles succeeds or fails on preparation: what comes up, what is found underneath, and how flat the surface is before the first plank goes down. Adcom installs the floors customers select from its North Hollywood flooring showroom on request, and Google reviewers describe exactly that arrangement, one writing, “We purchased our flooring and installation.” Stairs and kitchens bring their own details, covered under stair flooring and kitchen flooring.

What flooring installation in Los Angeles covers, material by material

Each floor type goes down differently, and the method determines how much prep the job needs and how long it takes.

Typical methods; the flooring maker’s instructions take priority.
FloorUsual methodSubfloor needsNotes
Solid hardwoodNailed or stapledPlywood or plank over joistsOver a slab, needs an added wood subfloor
Engineered hardwoodFloating, glued or nailedFlat slab or wood subfloorSlab moisture test before gluing
Waterproof vinyl plankFloating click-lock or glue-downVery flat; flaws telegraphExpansion gaps at walls and islands
LaminateFloating over underlaymentFlat, dry; vapor barrier on slabsUnderlayment decides sound
CarpetStretched over pad and tack stripClean, sound surfaceSeams planned away from traffic
Tile and stoneSet in mortarRigid, flat; often a membraneSee tile installation
Hands nailing a red oak hardwood board to a plywood subfloor in a raised-foundation Los Angeles home
Solid hardwood is nailed through the tongue into a wood subfloor.Illustration

Old floor removal: what comes up and what to test first

Removal ranges from an hour of pulling carpet to days of chipping thinset tile off a slab. Glued-down wood, sheet vinyl with heavy adhesive and ceramic tile set in mortar are the slow ones, and they make the most dust.

  • Asbestos in older flooring. Some vinyl tiles, sheet vinyl backings and black mastic adhesives installed before the 1980s contained asbestos. Have suspect material tested before anyone sands, grinds or scrapes it; in the Los Angeles area, asbestos removal falls under South Coast AQMD rules and must be handled by qualified abatement contractors.
  • Lead paint on trim. In homes built before 1978, removing painted baseboards or door casings can disturb lead paint, which brings in the EPA’s lead-safe RRP work practices.
  • What to ask your installer. Whether removal and haul-away are in the price, what happens to baseboards, and who moves furniture and appliances.
Old 9-inch vinyl floor tiles and black mastic exposed on a slab during flooring removal
Old 9-inch tiles and black mastic should be tested before anyone scrapes or grinds them.Illustration

Questions about flooring installation?

Call with your measurements and photos, or stop by Sherman Way to compare cabinets, counters, tile and flooring side by side.

Subfloor repair in raised-foundation and hillside homes

Older Los Angeles houses and many hillside homes sit on raised foundations, with plywood or plank subfloors over joists and a crawl space below. Once the old floor is up, a few problems are common:

  • Squeaks, usually loose subfloor against a joist, fixed by screwing the subfloor down.
  • Soft spots near toilets, tubs, sinks and dishwashers, often the sign of an old leak. Damaged plywood should be cut out and replaced.
  • Plank subfloors with gaps between boards, which may need a plywood overlay before vinyl or tile.
  • Sagging or bouncy areas, which can point to a framing or foundation issue rather than a flooring one.

Floor leveling and slab prep for post-war Valley homes

Slab-on-grade houses, common in post-war Valley tracts, tend to have humps, cracks and low spots, especially after years of settling. Hard floors, and click-lock vinyl and laminate in particular, need a surface that is flat to the tolerance in the product instructions, or joints can flex and break.

  1. A straightedge or laser finds high and low areas across each room.
  2. High spots and old adhesive ridges are ground down.
  3. Cracks are cleaned and filled; active cracks that keep moving deserve a closer look before covering.
  4. Low areas are filled with patch or self-leveling compound.
  5. The slab is tested for moisture, by calcium chloride or in-slab humidity tests, before adhesives or wood products go down.

Signs the previous floor went down on poor prep

  • Click-lock planks that bounce or click underfoot over a dip in the slab.
  • Seams that peak in front of a sunny slider where no expansion gap was left.
  • Glue-down planks lifting in one corner where slab moisture was never tested.
  • Tile with cracks that run straight across the room over a slab crack.

Each of these repeats under a new floor unless the cause is fixed, which is why the prep lines in a quote deserve as much attention as the material.

Aluminum straightedge on a bare concrete slab showing a gap over a low spot before leveling
A straightedge shows the low spots that need filling before a click-lock floor goes down.Illustration

How does a flooring installation project run from the showroom?

  1. Choose the floor

    Compare materials and colors at the showroom with photos and rough measurements of your rooms.

  2. Measure and inspect on site

    Room sizes are confirmed, and the existing floor, subfloor type, door clearances and transitions are noted.

  3. Get a written scope

    The quote should spell out removal, subfloor prep, leveling, underlayment, trim, stairs and what happens with furniture.

  4. Order and acclimate

    Ask about arrival timing when ordering. Wood products sit in the home for the period the manufacturer specifies.

  5. Prep and install

    Removal, repairs and leveling come first, then the floor is laid room by room with expansion gaps where required.

  6. Trim and walk-through

    Baseboards or quarter round, transitions and door clearances are finished, then you walk the floor together and note anything to address.

Whole house flooring: can one floor run through every room?

One continuous floor from the entry to the bedrooms makes a modest house feel larger. It also raises a few practical points that are easier to settle before ordering.

  • Large floating floors may need expansion joints at doorways; ask whether the product allows long continuous runs.
  • Height changes where new flooring meets tile in a bathroom or an existing floor need transitions or reducers.
  • Interior doors may need trimming at the bottom if the new floor sits higher than the old one.
  • Appliance openings, especially the dishwasher, must still clear once the floor is in.
  • Living in the house during the work is possible in stages, room by room, but kitchens and single bathrooms take planning.
Wood-look floor meeting bathroom tile at a doorway with a slim metal transition strip
Transitions handle height changes where a new floor meets tile or an existing floor.Illustration

Flooring installation cost: the factors behind a quote

  • The material and method: carpet and floating floors usually install faster than glue-down vinyl, nailed hardwood or tile.
  • Removal difficulty: tile over a slab and glued-down floors take far more labor than carpet.
  • Subfloor repair and leveling: often the most variable line in the quote, unknown until the old floor is up.
  • Room count and layout: closets, hallways and angled walls add cuts and time.
  • Stairs: priced per step, with nosings and risers as separate parts.
  • Trim and transitions: new baseboard, quarter round, door undercutting and reducers.

Our article on flooring installation cost in Los Angeles explains how to compare quotes line by line.

Checking floor installers, and why customers buy and install through Adcom

California’s Contractors State License Board licenses flooring contractors in the C-15 (Flooring and Floor Covering) class, with tile setters in C-54. Before hiring anyone for flooring work, look up the license at cslb.ca.gov and confirm it is active.

  • Material and installation in one place. Choose from hardwood, engineered wood, waterproof vinyl, laminate, carpet and stone, then have it installed on request.
  • Installers reviewers remember. One Google reviewer described the installer as a great guy who wasn’t afraid to work.
  • Everything else on display. Cabinets, countertops and tile are in the same showroom, so the floor can be coordinated with the rest of a remodel.

Installation customers come from Glendale hillside streets, La Crescenta-Montrose foothill homes, Burbank and across Los Angeles.

What Google reviewers say

Quoted from public Google reviews. Adcom Kitchen & Flooring has 20 Google reviews; read them all on Google.

“Tony and his guys are awesome. We purchased our flooring and installation from him, and couldn’t be happier with the results. He helped us find a style that we would love, and the installation was well done.”
Shanna Google review · c. 2025
“Great selection great service. Tony Jr. Was great he beat everyones prices and he stands by his word. Very easy to work with. If he doesn't have the tiles not to worry he'll find it and beat any price within reason.”
Carlo B. Google review · c. 2018
“They have a huge selection of kitchen cabinets, tiles and flooring. But the best part is their service. Tony Jr. is beyond reasonable, honest and he went out of his way to make sure we get the products and meet our deadlines. Highly recommended!”
Larry T. Google review · c. 2023

Flooring Installation around Los Angeles and Ventura counties

Flooring Installation: common questions

How long does flooring installation take?

It depends on the material, the size of the job and the prep. Carpet in a few bedrooms or a floating floor in an open living area is often a one- or two-day job. Removing old tile, leveling a slab, nailing solid hardwood or finishing a site-sanded floor adds days. Acclimation time for wood comes before the install date, so build it into your schedule.

Do you level uneven subfloors?

Leveling is part of preparing for most hard floors, and the installation quote should say how it will be handled. On slabs that usually means grinding high spots and filling low areas with leveling compound; on wood subfloors, screwing down loose areas and replacing damaged panels. If the unevenness comes from framing or foundation problems, that structural repair needs the right licensed trade first.

Can I stay home during flooring installation?

Usually, yes, though not in the rooms being worked on. Floating floors and carpet produce little dust or odor; tile removal, grinding and site-finished hardwood are much messier, and some finishes require you to stay off the floor for a period. Kitchen and single-bathroom homes take more planning. Ask the installer to stage the work so a bedroom and bathroom stay usable.

Do you install baseboards and transitions?

Transitions and edge trim are part of finishing most floor installations, and new baseboard or quarter round can be included in the scope. Ask for those items to be listed in the quote. Where a new floor sits higher than an adjoining tile or wood floor, a reducer or threshold handles the change, and interior doors may need trimming to clear.

Do I need a permit to replace flooring?

Replacing floor covering is generally treated as finish work that does not need a building permit. Structural work is different: replacing joists, beams or foundation elements uncovered during the job can require one. In the City of Los Angeles, check with LADBS; other cities have their own building divisions. Condo owners also need HOA approval before work.

What should I do before installers arrive?

Clear small items, decor and closet floors, and confirm in advance who is moving furniture and appliances. Take down anything fragile on walls next to the work. Plan where pets and children will be. For wood, make sure the boxes have been in the house for the acclimation period. Keep the air conditioning or heat at normal living temperatures.

Request a flooring installation quote

Calling is fastest: (818) 765-9955. Prefer to write? Send the basics and the showroom will get back to you.

Faster: call (818) 765-9955

Ready to see it in person?

Bring your photos and measurements to the Sherman Way showroom, or call and talk it through first.

Adcom Kitchen & Flooring · 13259 Sherman Way, North Hollywood, CA 91605 · Get directions · Showroom hours

Call (818) 765-9955 Directions