Skip to content
Adcom Kitchen & Flooring
Newly installed white kitchen cabinets with a level line still visible on the wall of a Los Angeles kitchen

Kitchen Cabinets

Cabinet Installation in Los Angeles, CA

Kitchen cabinet installation in Los Angeles goes best when the people who sold you the boxes also set them, because nothing gets lost between the order and the wall. When you pick cabinets from the kitchen cabinets floor at Adcom, installation is available on request: the old run comes out, the new boxes are leveled, fastened into studs and finished with doors, drawers and pulls. It works the same for custom kitchen cabinets built to your walls and for imported cabinets with frameless boxes.

Kitchen cabinet installation in Los Angeles: what the job covers

A cabinet install is more than hanging boxes. The scope below is what a typical new cabinet installation involves once the order has arrived; your written quote should list each item so you can see what is and is not part of the job.

  • Protecting floors, counters you are keeping and the path from the street to the kitchen
  • Taking out the existing base and wall cabinets, and noting any damage behind them
  • Finding the high point of the floor and marking a level line for the base run
  • Locating studs and setting the wall cabinets on a level ledger line
  • Shimming, clamping and screwing boxes together so faces line up
  • Scribing fillers and end panels to walls that are not plumb
  • Cutting openings for plumbing stub-outs and outlets that are already in place
  • Hanging doors, fitting drawer fronts, adjusting hinges and mounting pulls

Toe kicks, crown molding and light rail are usually the last pieces on, after the boxes are checked one more time for level and square. Countertop templating comes after that, because a stone fabricator measures off the installed cabinets, not the drawing.

How do good cabinet installers near me work from order to final hinge?

Here is how the process runs when the cabinets come from the Sherman Way showroom and you ask for them to be installed.

  1. Settle the layout and the order

    Box sizes, filler widths and appliance openings are confirmed against the walls before ordering, so the install is not spent fixing a sizing mistake.

  2. Check the delivery

    When the cabinets arrive, every carton is opened and checked against the order for size, finish and damage. A chipped door is far easier to replace before it is hung.

  3. Clear the kitchen

    You empty the old cabinets and arrange for the plumber or electrician to disconnect the sink, dishwasher and range if those trades are involved.

  4. Remove and prep

    Old cabinets come out, the walls are checked for studs, old fasteners and soft spots, and level lines go on the wall.

  5. Set, level and fasten

    Wall cabinets usually go up first so nobody leans over base boxes to reach them, then the base run is shimmed and anchored.

  6. Doors, drawers and hardware

    Doors are hung and adjusted so reveals are even, drawers are aligned and pulls are mounted to a template.

  7. Walk-through

    You open every door and drawer with the installer before the countertop is measured, and any adjustment is noted then.

Installer’s hands placing a wood shim under a base kitchen cabinet next to a bubble level
Base cabinets are set to the high point of the floor and shimmed everywhere else.Illustration

Questions about cabinet installation?

Call with your measurements and photos, or stop by Sherman Way to compare cabinets, counters, tile and flooring side by side.

Cabinet leveling and anchoring for earthquake country

Floors in older San Fernando Valley houses are rarely flat, and a slab that has settled a little can drop a quarter inch or more across a 12-foot wall. Base cabinets are set to the highest point, then shimmed up everywhere else, so the counter on top ends up dead level. Standard base boxes are 34½ inches tall, which puts a finished counter at about 36 inches; the bottom of wall cabinets typically sits around 54 inches off the floor, leaving roughly 18 inches of backsplash.

General installation practice; the cabinet manufacturer’s instructions apply to each line.
DetailStandard practiceWhy it matters in LA
Wall cabinet fasteningCabinet screws through the back rail into studs, at least two per boxDrywall anchors alone can pull out when a loaded cabinet shakes
Box-to-box connectionAdjacent boxes clamped and screwed together through face frames or side panelsA connected run moves as one unit instead of shifting box by box
Base cabinet fasteningScrewed to studs at the back rail after shimmingKeeps the run from creeping when drawers are yanked open
ShimsHardwood or composite shims at studs and under the box sidesCorrects sloped floors and bowed walls without crushing the box
Upper door latchesOptional child-safety or seismic latches on doors over walkwaysHelps keep dishes inside during shaking

For more on latches, stone tops and heavy-dish storage, read the guide to an earthquake-ready kitchen.

Cabinet replacement in Los Angeles: what to settle before demolition

Replacing cabinets in the same footprint is the simplest version of the job. The moment the sink moves to an island, the range moves to another wall or a new circuit is needed for an appliance garage, the project picks up plumbing, gas or electrical work.

Have rough-in work finished and inspected before the cabinets go in, and give the trades the final cabinet drawing so drain and supply lines land inside the sink base instead of behind a drawer stack.

New sink base cabinet with clean cutouts around drain and supply stub-outs in a Los Angeles kitchen
Openings in the sink base back are cut to land around plumbing stub-outs that are already in place.Illustration

RTA cabinet assembly and installation

Ready-to-assemble cabinets ship flat and save money on the box, but someone has to build every one before it can be hung. Assembly adds labor, and the quality of an RTA kitchen depends heavily on how carefully each box is squared and glued.

  • Square before you screw. A box assembled even slightly out of square makes doors rub and reveals uneven down the whole run.
  • Check the joinery. Cam-lock boxes go together quickly; glued dowel or dado joints are stiffer once dry.
  • Assemble near the kitchen. Building boxes in a garage and carrying them in avoids scuffs on finished sides.
  • Count hardware early. Missing hinges or shelf pins discovered on install day stop the job.
Flat-pack kitchen cabinet box being squared with a framing square on a garage floor before installation
A ready-to-assemble box is checked for square before it is screwed and glued together.Illustration

Pre-assembled boxes skip that step entirely. The trade-offs between the two are laid out on the semi-custom and stock cabinets page.

What changes the kitchen cabinet install cost?

Installation labor is quoted per job because two kitchens with the same number of boxes can take very different amounts of time. These are the factors that usually move the number:

  • Box count and tall units: pantry and oven towers are heavier and fussier to plumb than base boxes.
  • Removal of the old kitchen: tear-out, disposal and patching behind the old cabinets.
  • Floor and wall condition: heavy shimming, scribing and filler work on uneven surfaces.
  • Assembly: RTA boxes must be built before they are set.
  • Trim package: crown, light rail, finished end panels and decorative legs.
  • Access: condos and upstairs units with long carries, elevators or limited parking take longer.
  • Hardware: mounting pulls on every door and drawer, and soft-close add-ons.
Inside of an upper kitchen cabinet showing cabinet screws driven through the back rail into studs
Wall cabinets are fastened through the back rail into framing, not drywall alone.Illustration

Why have Adcom install the cabinets you pick?

  • The cabinets and the install come from one place. Installation of selected products is offered on request, so sizing questions go back to the same showroom that placed the order.
  • Counters, tile and floors are chosen in the same building. Stone counters, wall tile and floor samples are displayed a few steps from the cabinet doors, which keeps the finished kitchen consistent.
  • Homes and businesses alike. Cabinet runs for houses, rental units and commercial kitchens are all part of the work.
  • Easy to find again. Archived copies of the business website going back to 2015 all list the same Sherman Way storefront, so a question after the install has somewhere to go.

Clients come in from all over the region. Burbank homeowners and Glendale kitchens are a short drive east, Santa Clarita households come down the 5, and the Los Angeles service area page covers the city neighborhoods. Caring for new boxes in hot, dry weather is covered in cabinet care for dry Valley heat.

What Google reviewers say

Quoted from public Google reviews. Adcom Kitchen & Flooring has 20 Google reviews; read them all on Google.

“Tony and his guys are awesome. We purchased our flooring and installation from him, and couldn’t be happier with the results. He helped us find a style that we would love, and the installation was well done.”
Shanna Google review · c. 2025
“They have a huge selection of kitchen cabinets, tiles and flooring. But the best part is their service. Tony Jr. is beyond reasonable, honest and he went out of his way to make sure we get the products and meet our deadlines. Highly recommended!”
Larry T. Google review · c. 2023
“Great selection great service. Tony Jr. Was great he beat everyones prices and he stands by his word. Very easy to work with. If he doesn't have the tiles not to worry he'll find it and beat any price within reason.”
Carlo B. Google review · c. 2018

Cabinet Installation around Los Angeles and Ventura counties

Cabinet Installation: common questions

How long does kitchen cabinet installation take?

For an average kitchen in the same footprint, setting cabinets typically takes a few working days once the order is on site, longer if boxes need assembly or the floors need heavy shimming. Plumbing or electrical changes add inspection time before cabinets go in. Ask for a schedule when the cabinets arrive, then book countertop templating for after the boxes are fully set and checked.

Do you remove and haul away old cabinets?

Taking out the existing cabinets is part of a replacement job. Whether disposal and haul-away are included, and how damaged drywall behind the old boxes is handled, should be spelled out on your written quote. Empty the cabinets first, and have a plumber disconnect the sink and dishwasher beforehand if the work involves supply or drain lines.

How are cabinets anchored for earthquakes?

Wall cabinets are screwed through their back rail into wall studs, adjacent boxes are fastened to each other so the run moves as one, and base cabinets are screwed to studs after leveling. In a Valley kitchen that sees regular shaking, adding latches to upper doors near walkways and storing heavy dishes in lower drawers adds another layer of protection.

Do you install cabinets bought elsewhere?

Installation is offered for the products you select at the showroom. If you already bought cabinets somewhere else, call and describe the line, how many boxes and whether they are assembled; the showroom team can tell you whether that job is something they can take on. Bring the order sheet so sizes can be checked against your walls.

Should new cabinets go in before or after the new kitchen floor?

It depends on the floor. Tile and glue-down floors often run under the cabinets, while floating floors such as click vinyl or laminate are usually installed after the cabinets so the boxes do not pin the floor down. Either way, decide the order before demolition, because it changes base cabinet height and toe-kick details. The kitchen flooring page covers the options.

Who measures for the countertop after the cabinets are set?

The countertop fabricator measures, or templates, the installed cabinets, because the stone must fit the real boxes and walls rather than the plan. If the countertop also comes from Adcom, the countertop installation page explains how that step follows the cabinet install. Do not load the cabinets with heavy items until the counter is set.

Request a cabinet installation quote

Calling is fastest: (818) 765-9955. Prefer to write? Send the basics and the showroom will get back to you.

Faster: call (818) 765-9955

Ready to see it in person?

Bring your photos and measurements to the Sherman Way showroom, or call and talk it through first.

Adcom Kitchen & Flooring · 13259 Sherman Way, North Hollywood, CA 91605 · Get directions · Showroom hours

Call (818) 765-9955 Directions