Skip to content
Adcom Kitchen & Flooring
Modern office break room with walnut-tone cabinets, white quartz counter and gray commercial vinyl floor in Los Angeles

Home Remodeling

Commercial Kitchen and Flooring Remodels for LA Businesses

A successful commercial remodel in Los Angeles, whether it is an office break room, a retail floor or a reception area, starts with finishes rated for heavy daily use and a schedule built around your business hours. The details that trip up owners are rarely the materials themselves: they are accessibility rules, the landlord’s approval and the order in which trades arrive.

By the Adcom Kitchen & Flooring showroom team · Published

What do office break rooms and staff kitchens need?

A staff kitchen sees more hands in a day than a home kitchen sees in a week. Choose parts that tolerate constant use and that a facilities person can fix without calling a designer.

  • Plywood cabinet boxes and full-extension drawers. They hold up to doors being slammed and drawers loaded with supplies.
  • Quartz or granite counters. Both resist coffee stains and hot carafes; a full slab suits a long run or reception desk, while prefab tops keep a short break room in budget.
  • An accessible work section. At least part of the counter and the sink area typically has to meet accessibility heights and knee clearance in a commercial space.
  • Appliance space planned up front. Undercounter refrigerators, ice machines and coffee equipment need exact openings and dedicated outlets.
  • Backsplash tile that wipes clean. Larger porcelain tiles mean fewer grout lines to stain.
Staff kitchen counter with a lowered accessible section and open knee space beside the sink
A lowered counter section with knee space is a common way to meet accessibility rules in a staff kitchen.Illustration

Want to see the options in person?

The Sherman Way showroom has cabinets, counters, tile and flooring on display side by side. Call before you come and say what you're working on.

Which commercial flooring handles constant foot traffic?

Commercial floors fail at entries, behind counters and under rolling chairs. Match the product to the traffic in each zone rather than using one floor everywhere.

General guidance; confirm the manufacturer’s commercial rating and warranty terms for the exact product.
FloorStrengthsWatch forTypical zones
Commercial-rated vinyl plank or tileWater-resistant, quiet, easy to replace in sectionsPick a commercial wear layer; many commercial lines use about 20 milOffices, retail, break rooms
Porcelain tileVery hard-wearing, easy to mop, slip-resistant finishes availableNeeds a flat substrate and cure time for groutEntries, restrooms, kitchens
Natural stoneUpscale look for lobbiesSealing and slip resistance when wetReception areas
Commercial carpetAcoustics and comfortStains near food areasPrivate offices, conference rooms

Where floors meet, plan transition strips and the height difference before ordering, especially at accessible routes where a raised edge becomes a trip hazard.

How do you remodel a business without closing the doors?

  1. Map the space into phases

    Split the floor into areas that can close one at a time, and keep at least one restroom, the entrance and the exit route usable throughout.

  2. Order every material before demolition

    Cabinets, counters, tile and flooring should be on hand, or have a confirmed arrival date, before anything is torn out.

  3. Schedule noisy work after hours

    Tear-out, tile cutting and grinding are usually booked for evenings or weekends; check building rules for permitted work hours.

  4. Protect what stays

    Cover adjacent floors, seal off dust with plastic walls and keep walkways clear for staff and customers.

  5. Install flooring once the trades leave

    Floors go down after electrical, plumbing and painting are finished, so nothing heavy rolls across fresh material.

Ask about low-odor adhesives and grout products when people will be working nearby the next morning.

What permits and rules apply to a commercial remodel in Los Angeles?

Commercial work carries more paperwork than a home kitchen. In the City of Los Angeles, tenant improvements go through LADBS plan check; in Burbank and other incorporated cities, the local building division handles them. California’s building code applies accessibility requirements to commercial spaces, so counter heights, clearances and routes are checked during plan review.

  • Landlord approval. Most commercial leases require written consent for finish changes; send the sample selections early.
  • Food service. A space that prepares or sells food generally needs plan approval from the health department, which for most of the county is LA County Public Health; Pasadena, Long Beach and Vernon run their own.
  • Licensed trades. Electrical, plumbing and structural changes call for properly licensed contractors; verify each on the CSLB lookup at cslb.ca.gov.

How do accessibility rules shape floors, counters and transitions?

In California, commercial accessibility is set by Chapter 11B of the California Building Code, alongside the federal 2010 ADA Standards. For a business owner choosing finishes, a handful of measurable rules matter most, and they are easier to meet when chosen than when corrected after an inspection.

Summarized from the 2010 ADA Standards (sections 302, 303, 902 and 606); California’s Chapter 11B is checked at plan review and can be stricter.
ItemWhat the standards sayWhat it means when choosing
Floor surfaceFloors on an accessible route must be stable, firm and slip resistantMatte porcelain or commercial vinyl; avoid polished stone on routes that get wet
Changes in levelUp to 1/4 inch may be vertical; 1/4 to 1/2 inch must be beveled; more needs a rampPlan floor thicknesses so tile, vinyl and carpet meet at nearly the same height
CarpetPile no higher than 1/2 inch, securely attached, with trim on exposed edgesLow-pile commercial carpet tile in offices; no thick pad
Work surfaces and sinksAccessible portions no higher than 34 inches, with knee clearanceA lowered counter section beside the sink in a break room

Alterations can also trigger work beyond the room being remodeled. Under Chapter 11B, when a project in an existing building passes an annually adjusted cost threshold, part of the construction budget generally has to go to improving the accessible path of travel, such as the entrance, restrooms and parking. Ask your designer or architect early whether your scope crosses that line, and consider an inspection by a Certified Access Specialist (CASp), a California program for reviewing a site’s accessibility.

Beveled metal transition strip joining porcelain tile to low-pile carpet tile along an office corridor
A low beveled strip where tile meets carpet keeps the change in level small along an accessible route.Illustration

What business owners learn at the sample table

Commercial selections go faster when the finishes are compared together and the order is planned around the job, not the other way around. A few lessons repeat:

  • Order the whole floor from one production lot. Color can vary between runs, which shows on a large open floor.
  • Build a sample board for approvals. One board with the cabinet door, counter, tile and floor makes landlord or franchise sign-off simpler.
  • Keep spares for every location. Businesses with several sites benefit from one standard spec and a few boxes of extra flooring at each.
  • Think about cleaning crews. Matte, mid-tone floors and tight grout joints reduce the time and chemicals needed every night.
Commercial finish sample board with a cabinet door, quartz chip, porcelain tile and vinyl plank laid on a table
A single sample board makes landlord or franchise approval easier.Illustration

Restaurants, salons and clinics: when someone else decides the floor

Some businesses do not get a free choice of finishes, and it is better to know that before falling for a sample.

Food service

California’s Retail Food Code requires floors in food preparation, storage and warewashing areas to be smooth, durable, nonabsorbent and easy to clean, with coved base where the floor meets the wall. The health department’s plan check confirms the exact products. A front-of-house dining room has more freedom than the kitchen behind it, but the line between the two has to be drawn on the plans.

Salons and spas

Hair color, bleach and acetone stain or soften some floor surfaces. Porcelain tile handles chemicals best; if vinyl is chosen for comfort at the stations, test a sample with the products actually used in the shop.

Medical and dental offices

Treatment rooms are often specified with seamless or heat-welded sheet flooring so they can be disinfected, while waiting rooms and offices can take plank vinyl or carpet tile. Check what the practice’s infection-control guidance or landlord’s build-out standard calls for.

An honest note: some of these specifications, such as quarry tile or seamless resin floors for a full restaurant kitchen, fall outside a typical cabinet and flooring showroom’s range. The showroom is most useful for the front of house, break rooms, restrooms, reception and offices, where cabinets, counters, tile and floors are chosen together.

Commercial remodel work in Burbank and across Los Angeles

The North Hollywood showroom supplies residential and commercial projects, and a business owner can see cabinets, slab and prefab counters, tile and flooring in one visit. Burbank offices and shops are about 14 minutes (7 miles) away, and the Los Angeles service area page covers the Valley, Hollywood, downtown and beyond. Bring your plans or the contractor’s dimensions; installation of the products you select can be arranged on request.

Commercial and home remodeling pages to explore

The commercial remodeling page covers cabinets, counters and floors for offices, retail and break rooms. For mixed-use buildings or owner-occupied spaces, the home remodeling overview links to whole-house, addition and rental work.

Quick answers

Does a break room counter have to meet accessibility height rules?

In most commercial spaces, at least part of it does. The 2010 ADA Standards set a 34-inch maximum for accessible sinks and work surfaces with knee clearance below, and California’s building code has similar requirements checked at plan review. A common approach is a lowered section beside the sink, so the rest of the run can stay at standard height.

Can a shop floor be replaced over a weekend?

Sometimes, for a small space with a flat existing subfloor and a floating vinyl product. Tile takes longer because thinset and grout need cure time before heavy traffic. Have every box on site before the weekend, clear fixtures in advance, and confirm your building allows work during those hours.

Do commercial tenants need landlord approval for new finishes?

Usually yes. Most commercial leases require written consent before changing floors, cabinets or counters, and some landlords specify approved materials or require that the space be restored at lease end. Send a sample board and a product list with your request, and keep a copy of the approval with your permit file.

What wear layer should commercial vinyl flooring have?

For offices and retail, many owners choose a commercial wear layer around 20 mil, thicker than many residential products. Busy entries and rolling-chair areas benefit most. Check the manufacturer’s commercial rating and warranty terms for the specific product, since ratings differ between lines.

Sources

About this guide

Written by the team at Adcom Kitchen & Flooring, a kitchen cabinet, countertop, tile and flooring showroom at 13259 Sherman Way in North Hollywood. Rules and figures from outside sources are attributed; confirm current requirements with your building department or the agency named.

More on this topic: Home Remodeling

Talk to the showroom before you buy

Call with your measurements and photos, or stop by Sherman Way to compare cabinets, counters, tile and flooring side by side.

Adcom Kitchen & Flooring · 13259 Sherman Way, North Hollywood, CA 91605 · Get directions · Showroom hours

Call (818) 765-9955 Directions