What scope are you actually pricing?
Most bathroom projects fall into one of four tiers. Deciding which one you are in, before collecting quotes, makes every bid easier to compare.
| Scope | What it usually includes | Biggest cost drivers |
|---|---|---|
| Refresh | New vanity and top, faucet, mirror, lighting fixture, paint, possibly new floor | Vanity size and top material |
| Shower or tub update | New tile surround or shower, new valve trim, glass, in the existing footprint | Tile type, waterproofing, glass enclosure |
| Full remodel, same layout | Everything down to the studs and subfloor, rebuilt in place | Labor hours, tile area, hidden repairs |
| Layout change | Moving the toilet, shower or vanity; tub-to-shower conversion; new window or wall | Plumbing and drain moves, framing, permits and inspections |
The first two tiers are mostly about materials. The last two are mostly about trades and time, because plumbing, electrical and framing changes require permits and properly licensed contractors.
Want to see the options in person?
The Sherman Way showroom has cabinets, counters, tile and flooring on display side by side. Call before you come and say what you're working on.
- Showroom at 13259 Sherman Way, North Hollywood
- 20 Google reviews
- BBB rating A+
- Cabinets, counters, tile & floors in one place
Which materials move bathroom remodel cost in Los Angeles the most?
- Vanity: stock sizes in standard finishes cost far less than custom widths or furniture-style pieces. A double vanity adds a second sink, faucet and drain.
- Vanity top: prefabricated tops with an integrated or pre-cut sink are the budget route; slab granite, quartz or marble cut to size cost more and allow any size or edge.
- Shower walls: large porcelain panels or simple subway tile install faster than mosaics, patterned layouts or natural stone.
- Shower floor: a prefab pan is quicker than a site-built tiled pan; a curbless or linear-drain shower needs more preparation.
- Glass: a frameless enclosure costs more than a semi-frameless door or a curtain rod.
- Flooring: porcelain tile, natural stone or waterproof vinyl, plus heated-floor mats if you want them.
- Niches, benches and grab-bar blocking: small additions that each add labor.

How do you build a bathroom budget line by line?
A bathroom quote is easier to judge when you know which lines should appear on it and who normally supplies each one. Use this as a worksheet: write your own figures in the last column as bids arrive, and flag any line a bidder leaves out.
| Line item | Who usually supplies it | What to check on the bid |
|---|---|---|
| Demolition and haul-away | General or remodeling contractor | Whether removing a mortar-bed floor or cast-iron tub is priced separately |
| Rough plumbing and new valve | Plumber (C-36) | Valve type, any drain or vent moves, and who pays for the permit |
| Electrical, lighting and exhaust fan | Electrician (C-10) | Number of new circuits, GFCI protection and fan ducting to the outside |
| Waterproofing and shower pan | Tile setter or contractor | Membrane or pan system named, and whether a flood test is included |
| Tile and setting materials | Showroom or tile supplier | Square footage plus overage, trim pieces, grout type and sealer |
| Tile labor | Tile setter (C-54) | Price per area for walls, floor and niche, and extra for patterns |
| Vanity, top and sink | Showroom | Vanity width, top format (prefab or slab), faucet drilling |
| Fixtures and trim | Owner, plumber or showroom | Toilet, shower trim and faucets that meet California flow limits |
| Glass enclosure | Glass company | Measured after tile, so it is often a separate later quote |
| Permit and inspection fees | Contractor or owner | Which building department, and whether fees are inside the price |
| Contingency | Owner | A set-aside for rot, pipe or wiring found once walls open |
Two lines get forgotten. The glass enclosure is measured only after the tile is set, so it can arrive as a surprise second bill. And tile overage depends on layout: ask the installer how much extra the pattern needs, because diagonal and herringbone lays waste more than straight ones. The vanity tops and shower tile pages show the options behind the two showroom lines on this list.

What hidden conditions raise the price in older LA homes?
Many bathrooms in Los Angeles and older neighborhoods of Glendale were built decades ago, and what is behind the tile often adds to the bill once demolition starts.
- Rotted subfloor around the toilet or tub from slow leaks, common on raised foundations.
- Old galvanized supply pipes or cast-iron drains that a plumber recommends replacing while walls are open.
- Mortar-bed tile in pre-war and mid-century baths, heavy and slow to remove.
- Lead-based paint in homes built before 1978, which brings EPA lead-safe work rules into play.
- Possible asbestos in some older flooring, adhesives or wall materials, which should be tested before disturbing.
- No exhaust fan or an undersized one, which a remodel is the right time to fix.
Ask every bidder how they handle these conditions: a fixed price, an allowance, or a change order. That single answer often explains why two quotes differ.
Permits, codes and water-saving rules
Replacing a vanity or retiling in place may not need a permit, but moving plumbing, changing electrical or altering walls generally does. In the City of Los Angeles, LADBS issues bathroom permits; Glendale, Burbank and other incorporated cities issue their own, and unincorporated areas go through LA County Building and Safety.
California also sets water-use limits for new showerheads, faucets and toilets, and older homes may have to swap high-flow fixtures for compliant ones when a permitted alteration is finaled. New lighting in a remodel is subject to the state’s Title 24 energy standards. These rules are inexpensive to meet when planned, and costly to fix after an inspection.
| Fixture | California maximum | Set by |
|---|---|---|
| Showerhead | 1.8 gallons per minute | California Energy Commission, Title 20 appliance efficiency rules |
| Bathroom sink faucet | 1.2 gallons per minute | California Energy Commission, Title 20 |
| Toilet | 1.28 gallons per flush | California Energy Commission, Title 20 |
State law (Civil Code section 1101.1 and the sections after it, added by SB 407) also requires older, high-flow fixtures in existing homes to be replaced with water-conserving ones, and building departments can require that as a condition of signing off a permitted alteration. Budget for a new toilet and showerhead even if you planned to keep them.
Where bathroom budgets drift, and how to hold the line
Watching people plan bathrooms at the showroom, the overruns tend to come from a few predictable places rather than one big surprise.
- Tile chosen last. Picking tile after the budget is set often means a more expensive mosaic sneaks in. Choose shower and floor tile early.
- Too many tile types. Each extra tile, trim piece and pattern adds cuts and labor. Two or three tiles per bathroom is plenty.
- Custom vanity for a standard space. A stock 30-, 36- or 48-inch vanity with a quality top often looks just as good.
- Slab when prefab would do. A prefabricated vanity top in granite or quartz suits most single and double vanities at a lower cost.
- Moving the toilet a few inches. Drain moves are disproportionately expensive on a slab; keep fixtures in place where the layout allows.
- No overage on tile. Running short mid-job can mean a different dye lot; order extra from the start.
Seeing vanities, vanity tops, shower tile and flooring together makes it easier to set one palette and a realistic budget before work begins.

Should you remodel one bathroom or two at a time?
Many pre-war bungalows and Valley ranch houses were built with a single bathroom, sometimes with a second added later. That changes the cost conversation, because the real price of a remodel includes how the household lives without the room.
Doing both bathrooms together
Trades come once instead of twice, tile and vanity tops can be ordered in one batch, and you live through one round of dust. The trade-off is that the house may have no working shower for part of the job, and the total bill lands at once.
Doing them one after another
The household keeps a working bathroom, and lessons from the first room improve the second. The risk is matching: if both rooms share a floor tile or vanity finish, buy enough for both at the start, because a reorder months later can come from a different production run.
Phasing a single bathroom
Some owners replace the vanity and floor now and the shower later. If the shower will be rebuilt, the new floor often has to be cut back and patched, so settle the shower plan before laying a floor you want to keep.
Are third-party cost figures useful?
National cost surveys and online calculators can give a rough sense of scale, but averages blend tiny powder rooms with large primary suites, and Los Angeles labor and permit costs differ from national figures. Treat any published average as a starting point, then price your actual scope and materials.
Planning your bathroom with Adcom
The showroom supplies the vanities, vanity tops, tile and flooring for a bathroom and installs the products you select when you want it. Start with the bathroom remodeling overview and the shower remodel options, and look at bathroom vanities to size the biggest single purchase. Bring room dimensions and photos, and note which fixtures you want to move; that work will need a licensed plumber and a permit.
Quick answers
Is it cheaper to keep the bathroom layout the same?
Almost always. Keeping the toilet, shower and vanity where they are avoids moving drains and vents, which is especially costly in slab homes where concrete has to be cut. It also keeps the project simpler for permits. Spend the savings on better tile, a larger vanity or a frameless glass door, which you see every day.
Do I need a permit to remodel a bathroom in Los Angeles?
It depends on the scope. Swapping a vanity or retiling in place is often minor work, while relocating plumbing, adding circuits or changing walls requires a permit. Within the City of Los Angeles, LADBS decides; Glendale and other cities run their own building departments. Ask before work starts, because unpermitted work can complicate a future sale.
What is usually the most expensive part of a bathroom remodel?
In a full remodel, labor for the shower is often the biggest single line: demolition, waterproofing, tile setting and glass. Moving plumbing comes next when the layout changes. In a refresh, the vanity and top are usually the largest material purchase, so choosing a stock size with a prefab top makes a noticeable difference.
Can I save by reusing my existing tub?
Yes, if it is in good shape. A sound cast-iron or steel tub can stay while the surround, floor and vanity are replaced, which saves demolition and plumbing work. The surrounding tile needs care at the tub edge, and refinishing the tub itself is an option if the enamel is worn. Chipped or leaking tubs are usually better replaced.
How does having only one bathroom change a remodel budget?
It usually adds cost outside the bathroom. If the only shower is out of service, families pay for a gym membership, a stay with relatives or a short rental, or ask the contractor to keep the toilet working at night. Pre-war bungalows in Los Angeles often have one bathroom, so plan the order of work around that: rough plumbing and waterproofing first, and choose tile and the vanity before demolition so nothing waits on a decision.
Sources
- Los Angeles Department of Building and Safety (LADBS) — Permits for bathroom plumbing, electrical and structural changes in the City of Los Angeles
- Contractors State License Board (CSLB) — License lookup for plumbing, electrical, tile and general contractors
- California Energy Commission: Building Energy Efficiency Standards (Title 24) — Energy rules that apply to lighting and other remodel work
- U.S. EPA: Lead Renovation, Repair and Painting Program — Lead-safe practices for pre-1978 homes
- U.S. EPA WaterSense — Water-efficient toilets, faucets and showerheads
- California Energy Commission: Appliance Efficiency Regulations (Title 20) — Flow limits for showerheads, faucets and toilets sold in California
About this guide
Written by the team at Adcom Kitchen & Flooring, a kitchen cabinet, countertop, tile and flooring showroom at 13259 Sherman Way in North Hollywood. Rules and figures from outside sources are attributed; confirm current requirements with your building department or the agency named.
Related services
Service areas
More on this topic: Bathroom Remodeling
Talk to the showroom before you buy
Call with your measurements and photos, or stop by Sherman Way to compare cabinets, counters, tile and flooring side by side.
Adcom Kitchen & Flooring · 13259 Sherman Way, North Hollywood, CA 91605 · Get directions · Showroom hours
- Showroom at 13259 Sherman Way, North Hollywood
- 20 Google reviews
- BBB rating A+
- Cabinets, counters, tile & floors in one place

